Project Description

Engineering Services for Azusa Tunnel Repair

Engineering Services for Azusa Tunnel Repair

Owner: Pasadena Water and Power (PWP)
Prime: Kewo Engineering
Sub: Brandow & Johnson MTGL
Project Duration: 2019 – 2022

Overview

Overview

Overview

Kewo Engineering is providing engineering services for the Azusa Tunnel Repair. This includes providing the following services:

  • Project Management & Coordination.
  • Perform site visits to conduct assessments to determine the best methods for repair.
  • Develop and issue 30%, 60%, 90%, and final design submittal.
  • Obtain existing concrete samples to develop design requirements for anchors and epoxy.
  • Respond to RFI’s during construction and review submittals.
  • Develop documentation and drawings for transmittal to FERC for approval to perform work.
  • Draft and submit as‐built drawings.
  • Develop a summary of completed work.