Equipment
System and ratings
Construction
Design basis
Article 220Branch circuits and energy management
Circuits
Add a load, then set its details. Click a breaker on the drawing or a row of the schedule to edit it, or drag it on the drawing to move it.
Schedule
Load calculation
NEC checks
EV energy management
Basis
NEC 2023. Branch-circuit devices by 210.20(A), 215.3, 240.4, 240.6(A), 422.11, 422.13, 424.4(B), 430.52(C)(1), 440.22, 450.3(B) and 625.41; conductors by 210.19(A), 215.2(A), 110.14(C) and Table 310.16 with Table 310.15(B)(1)(1); equipment grounding conductors by Table 250.122; raceways by Chapter 9 Tables 1, 4 and 5.
Load calculation by Article 220 Parts II and III: Tables 220.42(A), 220.45, 220.47, 220.54, 220.55, 220.56, and 220.50, 220.51, 220.53, 220.57, 220.60 and 430.24; EV energy management by 625.42(A), 220.70 and 750.30. Phase currents from the circuit loads at unity power factor. Panel checks by 408.30, 408.36, 408.54, 110.9, 110.10, 240.85 and 240.86. Manufacturer data from published catalogs; confirm device selections with the manufacturer.
Inputs not valid
Results are not shown until the inputs are corrected, or a change is undone.