Project Description

PWP | Technical Specification for Stamped Concrete at Glenarm Power Plant Fountain
Owner: Pasadena Water and Power (PWP)
Period: 2022 – 2023
Overview
Overview
Kewo Engineering Corporation developed technical specifications to replace the existing paver stones at the Glenarm Power Plant fountain with Stamped Concrete. The following services were included as part of the project:
- Materials specifications (base material, concrete)
- Construction methods (excavation, base, forms, placement, finishing, reinforcing)
- Requirements for Contractor to develop permitted design
- Drawing showing project area and limits of work – no design or details.