Project Description

Radford Studios Centre
Owner: Radford Studios Centre
Period: 2023
Overview
Overview
Kewo Engineering Corporation is providing Radford Studios Centre with the following services:
- Load estimate for new load (29MVA & 3.4MVA)
- New service will be provided via two separate DWP IS stations. Each station will include two 7.5MVA 34.5kV/4.16kV utility transformers.
- Electrical service will be distributed to campus via 4.16 kV MV feeders.
- Each building will have electrical infrastructure to convert 4.16kV to 208V or 480V systems.
- 34.5kV ductbanks are passing thru the campus to get to each IS, consequently, DWP approval should be obtained in case any new building planned to be constructed at top of the existing DWP ductbanks.
- Electrical load for new buildings served from existing 2000A, 2400V switchgear