Kewo Engineering Corporation provided a total of eight (8) single port and three (3) dual port EV Chargers design. The scope of work include: 

  • Complete design plans for the installation of ChargePoint chargers, including site plan, single line diagram and panel schedules. 
  • Calculation of main panel and sub panel remaining capacity to ensure adequate power supply for new chargers. 
  • Design of electrical interconnection at sub panel to an existing utility pole. 
  • Ensure compliance with building code requirements and submit plans for building permit review and approval. 