Project Description

City of Anaheim | Electric Vehicle Charger Design
Owner: City of Anaheim Public Utilities
Period: 2022
Overview
Overview
Kewo Engineering Corporation provided a total of eight (8) single port and three (3) dual port EV Chargers design. The scope of work include:
- Complete design plans for the installation of ChargePoint chargers, including site plan, single line diagram and panel schedules.
- Calculation of main panel and sub panel remaining capacity to ensure adequate power supply for new chargers.
- Design of electrical interconnection at sub panel to an existing utility pole.
- Ensure compliance with building code requirements and submit plans for building permit review and approval.
- Review of contractor’s submittals and provide technical support during construction.