Project Description

Monte Visa Water District | Design & Engineering Services for the Plant 1 Underground Powerline Design Project

Owner: Monte Vista Water District
Period: 2025

Overview

Overview

The objective of the project is to relocate the existing aerial power and communication lines to underground installation, including relocating a pad-mounted transformer. 

Kewo Engineering provides engineering services for a critical project that involves relocating a dry utility aerial power line and communications cable. This project will transition these utilities to a new underground installation. Kewo Engineering is providing MVWD with the following services: 

  • Site Assessment and Documentation 
  • Design of Distribution Underground Power Line.  
  • Relocation of aerial power lines to an underground installation  
  • Relocation of pad-mounted transformer per future construction plans  
  • Relocation of communications cable to an underground installation 
  • Coordination with SCE  
  • Utility Coordination and Permitting