Project Description

Cedars Sinai | Overhead-Underground Conversion

Owner: Cedars Sinai
Period: 2024 – Present

Overview

Overview

Kewo Engineering provides engineering support and utility coordination for the overhead-to-underground conversion of the existing overhead lines located in the alleyway to the west of the Thalians Health Center at 8730 Alden Dr, Los Angeles, CA, 90048. The scope of work is including: 

  • Underground Conversion of Overhead Lines and Temporary Pole Relocation  
    • Site Visit 
    • Review available existing designs/drawings/documents of the project site and in-scope facilities. 
    • LADWP & utility coordination for the overhead lines and poles 
    • LADWP Coordination for pole relocation 
  • Engineering Design for Impacted Buildings  
    • Update/develop electrical drawings and supporting documentation (Site Plans, Single-Line Diagrams (SLD), Wiring Schematics, Panel Schedules, Load Calculations, Technical Specifications, Compliance Documents) 
    • Coordination and submission to LADBS