Project Description

Pasadena Water and Power (PWP) | General Engineering Services 

Owner: PWP (Pasadena Water and Power)
Project Value: $1,1M
Project Duration: 2022 – Present

Overview

Overview

The project objective is to provide PWP professional engineering firms to supplement its internal resources to help the Department of Water and Power in various engineering services for optimization, effectiveness, and efficiency. 

Kewo Engineering serves as Prime Contractor to provide advisory and design services to help the utility maintain the existing infrastructure and plan for growth that includes the following services: 

  • Underground Transmission and Distribution Design 
  • Receiving Station/Substation Design 
  • SCADA Station/Automation/Remote Gateway Design 
  • System Planning Services 
  • Civil and Structural Engineering 
  • Architectural Design 
  • Generation Station Design 
  • Service Planning and Customer Engineering 

Kewo Engineering has developed project specifications for the Substation Transformer and Switchgear Painting; Switchgear Weatherproofing project, and PWP Mobile Substation Specification project.