Project Description
GSA 05: Professional Electrical Services for Sharp Substation Protection and Automation Review and Improvement Project
GSA 05: Professional Electrical Services for Sharp Substation Protection and Automation Review and Improvement Project
Owner: City of Anaheim
Prime: Kewo Engineering
Sub: Strata Power & EPS
Project Duration: 2022 – 2023
Overview
Overview
Overview
KEWO Engineering is responsible for providing the following engineering services:
- A review of Sharp Substation’s existing protection and automation system settings and programming on the devices.
- Update and make recommendations for improvements.
- Create the standard templates for each device.
- Document all findings and modifications.
- Record effective protection strategy and philosophy.
- Provide technical support for City to transfer and cutover the protection, automation, and SCADA system smoothly from the existing control room to the new control building.
- Ensure Sharp substation is fully operational and functional for this Phase #1 project.