GSA 05: Professional Electrical Services for Sharp Substation Protection and Automation Review and Improvement Project

GSA 05: Professional Electrical Services for Sharp Substation Protection and Automation Review and Improvement Project

Owner: City of Anaheim
Prime: Kewo Engineering
Sub: Strata Power & EPS
Project Duration: 2022 – 2023

Overview

Overview

Overview

KEWO Engineering is responsible for providing the following engineering services:

  • A review of Sharp Substation’s existing protection and automation system settings and programming on the devices.
  • Update and make recommendations for improvements.
  • Create the standard templates for each device.
  • Document all findings and modifications.
  • Record effective protection strategy and philosophy.
  • Provide technical support for City to transfer and cutover the protection, automation, and SCADA system smoothly from the existing control room to the new control building.
  • Ensure Sharp substation is fully operational and functional for this Phase #1 project.