Project Description

Pasadena Water and Power| Glenarm BESS Interconnection Study
Owner: Pasadena Water and Power (PWP)
Period: 2024
Overview
Overview
The objective of this project is to provide PWP with an interconnection study report for the installation of a 25MW BESS at 72 E Glenarm St, connecting to Power Delivery’s Glenarm Receiving Station D, in Bay 4.
Kewo Engineering was responsible for providing the following services:
- Voltage Assessment
- Analyzed voltage impacts under BESS charge and discharge scenarios and recommended mitigation for over/under-voltage conditions
- Capacity Assessment
- Evaluated equipment and line capacity overloads during BESS operations and analyzed impacts of future PWP sub-transmission line upgrades
- Reliability Assessment
- Assessed reliability impacts of integrating the BESS, including contingency analysis under N-1 conditions (loss of one sub-transmission line or transformer bank)
- Short Circuit Duty Results
- Analyzed fault duty impacts on PWP’s existing infrastructure and determined necessary operational changes
- Reactive Power Deficiency Analysis
- Determined VAR requirements for both the sub-transmission system and BESS