Project Description
Engineering Services for Azusa Tunnel Repair
Engineering Services for Azusa Tunnel Repair
Owner: Pasadena Water and Power (PWP)
Prime: Kewo Engineering
Sub: Brandow & Johnson MTGL
Project Duration: 2019 – 2022
Overview
Overview
Overview
Kewo Engineering is providing engineering services for the Azusa Tunnel Repair. This includes providing the following services:
- Project Management & Coordination.
- Perform site visits to conduct assessments to determine the best methods for repair.
- Develop and issue 30%, 60%, 90%, and final design submittal.
- Obtain existing concrete samples to develop design requirements for anchors and epoxy.
- Respond to RFI’s during construction and review submittals.
- Develop documentation and drawings for transmittal to FERC for approval to perform work.
- Draft and submit as‐built drawings.
- Develop a summary of completed work.