Owner: Southern Power
Period: 2019 

Overview

Overview

Overview

Kewo Engineering Corporation (KEC) provided Design-Build services to design, procure and install control conduits and cables between two high-voltage substations in order to upgrade the existing Remedial Action Scheme system to a Centralized Remedial Action Scheme (CRAS). Kewo Engineering team designed construction services for the installation of three (3) new 4‐inch conduits between the Switchyard Enclosure Vault and Substation B Enclosure Vault at Garland Solar Facility. Construction services included Labor, Equipment and Materials for the following tasks: 

  • Mobilization and demobilization
  • Trenching
  • Install three (3) 4″ conduits
  • Mandrel conduits and install pull tape
  • Concrete encasement at access roads
  • Backfill 
  • Restore soil, gravel, and any damaged grounding  
  • As‐built drawings markups 

Kewo Engineering was utilizing D’ Ybanag Construction Company for this project