Garland Solar Facility Conduit Design-Build for Centralized Remedial Action Scheme

Garland Solar Facility Conduit Design-Build for Centralized Remedial Action Scheme

Owner: Southern Power
Prime:
Kewo Engineering
Sub: D’ Ybanag Construction Company
Project Duration: 2019

Overview

Overview

Overview

Kewo Engineering Corporation (KEC) provided Design-Build services to design, procure and install control conduits and cables between two high-voltage substations to upgrade the existing Remedial Action Scheme system to a Centralized Remedial Action Scheme (CRAS).

Kewo Engineering team has designed construction services for the installation of three (3) new 4‐inch conduits between the Switchyard Enclosure Vault and Substation B Enclosure Vault at Garland Solar Facility. Construction services include Labor, Equipment, and Materials for the following tasks:

  • Mobilization and demobilization.
  • Trenching.
  • Install three (3) 4″ conduits.
  • Mandrel conduits and install pull tape.
  • Concrete encasement at access roads.
  • Backfill.
  • Restore soil, gravel, and any damaged grounding.
  • As‐built drawings markups.