Project Description

Arc Flash Studies for GT-1, GT-2, GT-3, GT-4, and GT-5

Owner: Pasadena Water and Power (PWP)
Period: 2024 – Present

Overview

Overview

Kewo Engineering developed arc flash reports for GT-1 & GT-2, GT-3 & GT-4, and GT-5 electrical system. This includes responsibilities as follows:

  • Perform field verification, investigation and gather/collect all necessary data
  • Review existing relay settings 
  • Review previous arc flash reports 
  • Develop Arc Flash models using ETAP software 
  • Develop reports and Arc Flash warning labels